Common Features

202.2.4.9 Extended Scheduling Report

The extended scheduling report is a detailed log containing all the successful and unsuccessful scheduling actions performed during a scheduling operations: 

Each scheduling attempt is included in the report, indicating either the success (i.e. reserved!) or the failure of the event placement. Among the common reasons are:

•The asset is not suitable due to its parental guidance: The type of the asset linked to the event has a conflict with the 'parental guidance' allowed for the target segment.

•Target time in the day is less than current time plus the scheduling offset: The event has been scheduled in the current day but its scheduling time is outside the offset limit (i.e. it's too close to the current time).

•BL management: Indicates that an event has been blacklisted due to a failed scheduling attempt.